隧道开挖扰动了山体,激活原本稳定或缓慢变形的滑体,加速其下滑。本文基于峨汉高速建全村隧道洞口边坡的地形地貌、地质条件和监测数据,分析了山体变形与隧道变形的相互影响。山体蠕滑持续,导致隧道不均匀变形,进而引发四种病害:侵限、换拱、塌方及初支/二衬开裂。通过对四种病害段落的监控数据拟合,得出三种破坏模型:侵限的“对数型”、换拱的“二次型”、塌方及开裂的“直线型”。洞内变形促使对洞外边坡的关注,监测表明滑动面位于隧道拱顶上方,且有持续蠕滑现象。最终,通过不平衡推力法评估滑体下滑对隧道的影响。
关键词
参考
[] 龙建辉,李坤,郭晓娟.地下采动影响下滑坡稳定性及推力研究综述[J].太原理工大学学报,2019,50(02):141-152.
Long Jianhui,Li Kun,Guo Xiaojuan.Summary of research on the influence of underground mining on the stability and thrust of landslide[J].Journal of Taiyuan University of Technology,2019,50(02):141-152.
[] 刘飞,胡斌,宋丹,饶晨曦.开挖扰动对露天矿边坡稳定性影响分析[J].金属矿山,2013(12):111-114.
Liu Fei,Hu Bin,Song Dan,Rao Chenxi.Analysis of the influence of excavation disturbance on the stability of open-pit slope[J].Metal Mine,2013(12):111-114.
[] 陈明,郭天阳,卢文波,肖燕君,严鹏.爆破开挖对边坡岩体裂纹扩展的扰动机制[J].岩石力学与工程学报,2015,34(07):1307-1314.
Chen Ming,Guo Tianyang,Lu Wenbo,Xiao Yanjun,Yan Peng.Disturbance mechanism of blasting excavation on slope rock mass crack propagation[J].Chinese Journal of Rock Mechanics and Engineering,2015,34(07):1307-1314.
[] 左宇军,马春德,朱万成,李术才,宫凤强,陈春春.动力扰动下深部开挖洞室围岩分层断裂破坏机制模型试验研究[J].岩土力学,2011,32(10):2929-2936.
Zuo Yujun,Ma Chunde,Zhu Wancheng,Li Shucai,Gong Fengqiang,Chen Chunchun.Model test study on the failure mechanism of layered fracture of surrounding rock of deep excavated cavern under dynamic disturbance[J].Rock and Soil Mechanics,2011,32(10):2929 -2936.
[] 周文皎. 滑坡-隧道相互作用分析及控制对策[D].中国铁道科学研究院,2020.
Zhou Wenjiao. Landslide-tunnel interaction analysis and control countermeasures[D]. China Academy of Railway Sciences, 2020.
[] 雷坚强,丁彰芳.公路隧道施工监控量测与超前地质预报技术现状及思考[J].现代隧道技术,2013,50(06):32-38.
Lei Jianqiang,Ding Zhangfang.The status quo and thinking of highway tunnel construction monitoring and measurement and advanced geological prediction technology[J].Modern Tunnel Technology,2013,50(06):32-38.
[] 武科,马明月,李术才.付家冲隧道监控量测与稳定性评价[J].地下空间与工程学报,2012,8(03):543-548.
Wu Ke,Ma Mingyue,Li Shucai.Fujiachong Tunnel Monitoring Measurement and Stability Evaluation[J].Chinese Journal of Underground Space and Engineering,2012,8(03):543-548.
[] 董文德,高波,申玉生.高速公路双连拱隧道施工监控量测及分析[J].现代隧道技术,2006(06):40-44.
Dong Wende,Gao Bo,Shen Yusheng.Measurement and analysis of construction monitoring for double-arch tunnels of expressway[J].Modern Tunnel Technology,2006(06):40-44.
[] 汤加双,苏在林,张立军.全站仪三维非接触式围岩净空位移量测技术[J].铁道建筑技术,2003(05):50-52+74.
Tang Jiashuang,Su Zailin,Zhang Lijun.Three-dimensional non-contact surrounding rock headroom displacement measurement technology with total station[J].Railway Construction Technology,2003(05):50-52+74.
[] 王志才.全站仪三维非接触式围岩净空位移量测技术的应用[J].矿山测量,2003(02):44-46+5.
Wang zhicai.Application of 3D Non-contact Surrounding Rock Clearance Displacement Measurement Technology with Total Station[J].Mining Survey,2003(02):44-46+5.